Structural detailing and checking
of the Drilling Module for H&P International Drilling Company’s Rig 205
consisting of:
-
Skid base.
-
Lower & Upper Drilling Module Subs.
-
Crane
Base.
-
Crane
Tower.
-
Lower
& Upper Quarters.
-
Engine
Buildings.
-
SCR/MCC
& Air Compressor Buildings.
-
Piperack
Panels.
·
Structural detailing and checking
of the Drilling Module for H&P International Drilling Company’s Rig 206
consisting of:
-
Skid base.
-
Lower & Upper Drilling Module Subs.
-
Service Arm.
-
Piperack
Panels.
-
Engine
Buildings.
-
SCR/MCC
& Air Compressor Buildings.
·
Modifications to H&P International
Drilling Company’s Rig179 consisting of modifications to the Skidding Eye
additions to existing landing.
·
Modifications to H&P International
Drilling Company’s Rig202 consisting of modifications to the Drawworks Roof.
·
Modifications to H&P International
Drilling Company’s Rig203 consisting of modifications to the Drill Floor,
Lower Skid, & Shale Shaker Platform.
·
3D solids modeling of the Hydro-FLX
Compressor Prototype for Engine and Compressor Systems.
·
Prototype development of Christmas
Light w/ 3D solids models, fabrication details, & artwork for promotional
sales literature.
·
Detailing of Down Hole Coring Tool
for Fugro-McClelland Marine Geosciences, Inc.
·
Detailing of Rotating Blowout Preventer
for Northland Energy.
·
Modifications to Parker’s Rig 25
consisting of modifications to the Cantilever Beam, Substructure, Hold Down
and Push Up Structures and Cantilever Guide and Restraint Structures for Lewis
Engineering Group.
·
Detailing of Down Hole Coring Tool
for Japan Drilling Co. through Stress Engineering Services, Inc.
·
Modification and New Construction
Drawings for a minimal lift/modular rig for Parker Drilling through Loadmaster
Engineering, Inc.
·
3D modeling and fabrication drawings
of fuel cells for Reliant Energy.
·
Fabrication drawings of Derrick
Baskets for H&P International Drilling Company
·
Detailing of Ship Terminal Loading
Arms for CE Loading Systems, Inc.
·
Various Rig General Arrangements
and color map interpretations of rig limitations and placement for Parker
Drilling through Jatec Engineers and Designers and Loadmaster Engineering,
Inc.
·
New construction design and detailing
of Skid Base and Drilling Module modification for H&P International Drilling
Company’s Rig 108 through Jatec Engineers and Designers.
·
Design and detail of waster water
skids for Vortoil Separation Systems.
·
Detail and Depurators for Baker
Hughes Process Systems.
·
Detail of Silverbands for Baker
Hughes Process Systems.
·
Detail of Hydrocyclones for Baker
Hughes Process Systems.
·
Design of Multi-cell sand filters
for APT.
·
Detail of 150 HP test skid for
Lockheed.
·
Structural detailing of the Quarters
for Rowan’s Gorilla V Jack-Up.
·
Detail of electrical schematics.
·
Detail of skidded stream heat exchangers
for Leslie.
·
Detail of skidded rotating sludge
thickeners for Thickener Technologies, Inc.
·
As-builts of Driller’s consoles.
Retrofit of Driller’s consoles to accept new equipment.
·
Various Piping and Instrument Diagrams
(P&ID’s).
·
Design and detail of piping isometrics
at Merichem for Stress Engineering Services, Inc.
·
Safety Case of the Treasurer Driller
semi-submersible for Reading and Bates.
·
General Arrangements of Santa Fe’s
Shelf project #5.
·
Structural detailing of a caisson
for a jack-up barge for Lewis Engineering Group.
·
Detailing and checking of flow
diverters for Hydril.
·
Detail of drill jars for Serve-Pro
through Stress Engineering Services, Inc.
·
Structural detailing of platform
additions for US Gypsum.
·
Detail of a test fixture to simulate
wear on lap top hinges for Stress Engineering Service, Inc.
·
Structural detailing of Weatherford’s
30 m crane for Stress Engineering Services, Inc.
·
Redesign and detailing of a WWTP
siphon system for Chimney Hill for Stress Engineering Service, Inc.
·
Detail of Toolpusher’s Control
Panel for Hydril.
·
Detail of hydraulic pumping units
for Neddril and Amethyst for Hydril.
·
High pressure sub-sea mechanical
detailing for Hydril.
·
Structural detailing and checking
of the Drilling Module for Shell’s Ursa TLP for H&P International Drilling
Company, consisting of:
-
Skid base.
-
Pony structure.
-
Process package.
-
Drilling Module.
·
Service piping detailing and checking
of the Drilling Module for Shell’s Ursa TLP for H&P International Drilling
Company, consisting of:
-
Skid base.
-
Pony structure.
-
Drilling
module.
·
Structural detailing and checking
of Mobil’s Jade platform.
-
Drilling module.
-
Skid base.
-
Pump package.
-
Bulk package.
-
Completions
package.
-
Service
Arm.
·
Structural modifications for H&P
International Drilling Company’s rig 91 drilling module in the areas as follows:
-
Drawworks/drill floor structures.
-
Intermediate platform rework.
-
Sub-leg modifications
-
Skid base rework.
·
Over 100 jobs sold, designed and
delivered including the largest grossing job acquisition in the company’s
25 plus years history for Monarch Separators.
·
Performed all graphics work on
the following projects for Wilbur Smith and Associates:
-
Fort
Hood Transportation Study
-
Fort
Polk Transportation Study
-
Shreve
area Transportation Plan
-
JFK
and Lauder Road Improvements
·
Performed signal design on the
following projects in the County of Harris for Wilbur Smith and Associates:
-
Barker
Cypress @ West Little
-
Barker
-
Bellaire
@ Eldridge
-
Huffmeister
@ Ravensway